Introduction and overview or SES series of meeting.
Brief, targeted overview of SES needs, during commissioning (cold and hot) and early science
Brief, targeted overview of SES needs, during commissioning (cold and hot) and early science
Brief, targeted overview of SES needs, during commissioning (cold and hot) and early science
Brief, targeted overview of SES needs, during commissioning (cold and hot) and early science
Summary of SE systems and current schedule (within construction)
Summary of SE systems and current schedule (within construction)
Overview of TEFI SE systems
confirm top level spec
identify commonality between intstruments
what interfaces needed (mechanical, software)
usability, ergonomics, safety
confirm top level spec
identify commonality between intstruments
what interfaces needed (mechanical, software)
usability, ergonomics, safety
confirm top level spec
identify commonality between intstruments
what interfaces needed (mechanical, software)
usability, ergonomics, safety
Overview of TEFI SE systems
confirm top level spec
identify commonality between intstruments
what interfaces needed (mechanical, software)
usability, ergonomics, safety
confirm top level spec
identify commonality between intstruments
what interfaces needed (mechanical, software)
usability, ergonomics, safety
confirm top level spec
identify commonality between intstruments
what interfaces needed (mechanical, software)
usability, ergonomics, safety
to what extent can equipment be shared between floor and flange mounted instruments?
practicalities and safety for vacuum mounted SEE
*stray field issues, particularly wrt polarised neutrons
who does what during project stages?
- Detailed design
- procurement
- installation/integration
- maintenance
- normal operation
*outline of delivery schedule
* delivery date (cold vs hot commissioning)
* does SES impact instrument critical path.
confirm top level spec
identify commonality between intstruments
what interfaces needed (mechanical, software)
usability, ergonomics, safety
confirm top level spec
identify commonality between intstruments
what interfaces needed (mechanical, software)
usability, ergonomics, safety
confirm top level spec
identify commonality between intstruments
what interfaces needed (mechanical, software)
usability, ergonomics, safety
Schedule:
*outline of delivery schedule
* delivery date (cold vs hot commissioning)
* does SES impact instrument critical path.
who does what during project stages?
- Detailed design
- procurement
- installation/integration
- maintenance
- normal operation
floor and flange mounted interfaces
Summarise conclusions, consolidate notes, plan for Day 2
Possibility: Installation of equipment on BIFROST
A role play, where we will examine all stages of installation:
- transporting equipment from staging area
- location of auxiliary equipment
- location of utility supplies
- ergonomics of installation
- safety considerations
Possibility: install magnet on MAGIC
A role play, where we will examine all stages of installation:
- transporting equipment from staging area
- location of auxiliary equipment
- location of utility supplies
- ergonomics of installation
- safety considerations
How does cave design interact with SEE to ensure safety
Impact on operational models
facilitating lone working
Need for interlocked SEE
conclusions
allocate actions
decide on write up