CDR for Test Stand 2 Personnel Safety System

Europe/Stockholm
Pacific Water (SEC) (ESS)

Pacific Water (SEC)

ESS

John G Weisend II (European Spallation Source ERIC)
    • 13:00 13:15
      Committee discussion (closed)
    • 13:15 13:40
      PDR follow-up, SIL verification and updates on safety analysis 25m
      Speaker: Stuart Birch (European Spallation Source ERIC)
    • 13:40 14:00
      Verification and validation plan for TS2 PSS 20m
      Speaker: Paulina Skog (OTIF AB (IBAN))
    • 14:00 14:20
      Updates on concepts of operation and system's architecture 20m
      Speaker: Morteza Mansouri (European Spallation Source ERIC)
    • 14:20 14:40
      Hardware integration and interfaces 20m
      Speakers: Morteza Mansouri (European Spallation Source ERIC), Mr Peter Holgersson (ESS)
    • 14:40 15:00
      TS2 PSS electrical and mechanical design 20m
      Speaker: Alberto Toral Diez (European Spallation Source ERIC)
    • 15:00 15:15
      Coffee break 15m
    • 15:15 15:40
      Software requirements and software design 25m
      Speaker: Denis Paulic (European Spallation Source ERIC)
    • 15:40 16:00
      Progress on configuration management - ongoing work for TS2 PSS 20m
      Speaker: Meike Rönn (OTIF AB (IBAN))
    • 16:00 16:20
      Installation and commissioning plan 20m
      Speaker: Mr Mattias Eriksson
    • 16:20 17:10
      Committee deliberations (closed)
    • 17:10 17:25
      Closeout 15m
      Speaker: John G Weisend II (European Spallation Source ERIC)