    • 1
      Introduction and goals of meeting
      Speaker: Arno Hiess (European Spallation Source ERIC)
    • 2
      MP overview

      summary of SES list and schedule

    • 3
      Discussion with inst teams

      Q's: Does list match needs? What is prioritisation? Categorise: Day 1/later?

    • 4
      SES 1: BEER stress rig

      confirm top level spec
      identify commonality between instruments
      What interfaces needed (floor vs flange? what level, special limitations on installation, cable/piping length?)
      Usability, ergonomics, safety"

    • 11:20
      Coffee
    • 5
      SES 2: Dilatometer

      confirm top level spec
      identify commonality between instruments
      What interfaces needed (floor vs flange? what level, special limitations on installation, cable/piping length?)
      Usability, ergonomics, safety"

    • 6
      SES 3: Pool stress rigs

      confirm top level spec
      identify commonality between instruments
      What interfaces needed (floor vs flange? what level, special limitations on installation, cable/piping length?)
      Usability, ergonomics, safety"

    • 7
      SES 4: Chalmers furnace

      confirm top level spec
      identify commonality between instruments
      What interfaces needed (floor vs flange? what level, special limitations on installation, cable/piping length?)
      Usability, ergonomics, safety"

    • 12:35
      lunch
    • 8
      Roles and responsibilities discussion

      *For SES 1-4 define who does what in detailed design, procurement, installation/integration, maintenance, normal operation

    • 9
      Schedule
      • outline of delivery schedule for SES 1-3
      • delivery date (Cold or hot commissioning?)
      • does an SES impact instrument critical path?"
    • 10
      Summary and actions