    • 10:00 10:10
      Introduction and goals of meeting 10m
      Speaker: Arno Hiess (European Spallation Source ERIC)
    • 10:10 10:30
      MP overview 20m

      summary of SES list and schedule

    • 10:30 11:00
      Discussion with inst teams 30m

      Q's: Does list match needs? What is prioritisation? Categorise: Day 1/later?

    • 11:00 11:20
      SES 1: BEER stress rig 20m

      confirm top level spec
      identify commonality between instruments
      What interfaces needed (floor vs flange? what level, special limitations on installation, cable/piping length?)
      Usability, ergonomics, safety"

    • 11:20 11:35
      Coffee 15m
    • 11:35 11:55
      SES 2: Dilatometer 20m

      confirm top level spec
      identify commonality between instruments
      What interfaces needed (floor vs flange? what level, special limitations on installation, cable/piping length?)
      Usability, ergonomics, safety"

    • 11:55 12:15
      SES 3: Pool stress rigs 20m

      confirm top level spec
      identify commonality between instruments
      What interfaces needed (floor vs flange? what level, special limitations on installation, cable/piping length?)
      Usability, ergonomics, safety"

    • 12:15 12:35
      SES 4: Chalmers furnace 20m

      confirm top level spec
      identify commonality between instruments
      What interfaces needed (floor vs flange? what level, special limitations on installation, cable/piping length?)
      Usability, ergonomics, safety"

    • 12:35 13:35
      lunch 1h
    • 13:35 13:55
      Roles and responsibilities discussion 20m

      *For SES 1-4 define who does what in detailed design, procurement, installation/integration, maintenance, normal operation

    • 13:55 14:15
      Schedule 20m
      • outline of delivery schedule for SES 1-3
      • delivery date (Cold or hot commissioning?)
      • does an SES impact instrument critical path?"
    • 14:15 14:30
      Summary and actions 15m