IRR of Gallery Racks
Wednesday 15 Nov 2017, 09:00
→
12:00
Europe/Stockholm
1st FL - Atlantic Water (Lund ESS site)
1st FL - Atlantic Water
Lund ESS site
Odarslövsvägen 113 Lund
agenda
document
Delivery_and_Installation_Plan_Draft_Rev._2.0(1).pdf
Pentair_WP_15_Rack_Delivery_and_Installation_Schedule_Rev.2.0_RW.xlsx
Rack_Installation_IRR_Charge.docx
Rack_IRR_report.docx
Technical_Proposal(3).pdf
Work_Safety_Coordination_Plan_(WSCP)_G02_PENTAIR.docx
drawings
more information
12937-089_BET.PDF
12937-090_BET.PDF
12937-092_BET.PDF
12937-099_BET.PDF
12937-102_BET.PDF
Appendix_5.2_Rack_space_power_and_heat_dissipation_requirements_Rev10.xlsx
Rack-Types_Rev_1.1.pdf
1
Executive Session (Closed Discussion)
2
Welcome and opening of the meeting
3
Introduction to Rack Design and Installation
Speaker
:
Mr
Frithiof Jensen
(
European Spallation Source ERIC
)
drawings
Slides
Video
4
Presentation of Rack Aisle Design, Interfaces
Slides
5
Rack Aisle Assembly and Installation Process
10:30
Coffee Break
6
Deliberations by the review board (Closed Session)
7
Close Out Session