Wire scanner acquisition system

Europe/Stockholm
Conference Room Glimmingehus (ESS)

Conference Room Glimmingehus

ESS

summary
  • Tuesday, 29 November
    • 09:00 11:00
      PDR2 preparation
      slides
    • 11:00 12:30
      Interface with the mechanical parts of the WS Conference Room Glimmingehus

      Conference Room Glimmingehus

      ESS

      -Requirement on interface for the signal (signal path, vacuum feedthrough…)
      -Presentation of the current design status of MEBT WS
      -Presentation of the current design status of Cold linac WS
      -Motion control standard component

      Link for the Motion Controller: https://ess-ics.atlassian.net/wiki/display/MCAG/Open+Source+Motion+Control

    • 12:30 13:30
      lunch Break
    • 13:30 15:00
      Installation issues Conference Room Glimmingehus

      Conference Room Glimmingehus

      ESS

      -AFE installation with emphasis on maximum cable length
      -Radiation issues for the AFE -Installation in the tunnel -Cabling and rack

    • 15:00 15:30
      Coffee break Conference Room Glimmingehus

      Conference Room Glimmingehus

      ESS

    • 15:30 17:30
      WS standard platform and software Conference Room Glimmingehus

      Conference Room Glimmingehus

      ESS

      • WS acquisition chain
        -WS standard hardware plateform
        -ESS timing system
        -Motion controller standard
        -Component to be sent to Elettra from developpement (uTCA crate fully equipped, MC controller, software…)
  • Wednesday, 30 November
    • 09:00 10:00
      Protect issues Conference Room Glimmingehus

      Conference Room Glimmingehus

      ESS

      Brief introduction to MPS
      -Beam mode and operation of interceptive devices
      -Definition and implementation of the local protection (i.e anti collision)
      -Definition of the interface between the WS system and the local protection

      slides
    • 10:00 10:30
      Coffee break Conference Room Glimmingehus

      Conference Room Glimmingehus

      ESS

    • 10:30 12:00
      WS software issues Conference Room Glimmingehus

      Conference Room Glimmingehus

      ESS

      -ICS support to the WS system (driver...) -Synchronous motion and acquisition -Engineering panel definition
      -Operation of WS
      -Computation algorithm

      slides
    • 12:00 13:00
      Lunch break
    • 13:00 15:00
      Visit ESS tunnel Conference Room Glimmingehus

      Conference Room Glimmingehus

      ESS