Preliminary Design Review PDR Waste building H09

Europe/Stockholm
Paracelsus 203-1 (ESS)

Paracelsus 203-1

ESS

Tunavägen 24, Lund
Peter Jacobsson (European Spallation Source ERIC)
1. PDR Agenda 5 Feb 2018
Acoustic Design Report
Architectural layout
Basis for the load plan
Basis of Structural Design
Common Systems ICD
Drains and thresholds
ELECTRICAL DUCTING GROUND
ELECTRICAL DUCTING PLAN
ES&H system requirements on H09 Waste Building
Fire Safety Strategy Report
HVAC Connections to Earthwork systems
HVAC Cooling water Flow chart Baseline
HVAC Domestic Water Flow chart Baseline
HVAC Drawing binder Plan drawings PD
HVAC Flow chart controlled Ventilation
HVAC Flow chart Sprinkler
HVAC Flow chart Ventilation
HVAC Heating Flow chart
HVAC Radiological Waste Water Flow chart
HVAC Waste Water Flow chart Baseline
Process PFD process part 1
Process PFD process part 2
Process system requirement list
Radioactive Waste Transport Container ATB12K
System Description Electrical
System description H09 Waste building
System Description HVAC
System Description Process
System description Structure
System Description Transport
System Requirements Electrical
System Requirements H09 Structure
System Requirements HVAC
Technical Baseline Structural